Guangzhou Zhongke Refining and Chemical Integration Shaped Steel Structure Project is located in Donghai Island New District, Zhanjiang Economic and Technological Development Zone, Guangdong Province, which is a steel structure project with a steel consumption of about 8,000 tonnes and a cost of about 6.5 million.
Design Requirements:
Load Bearing: Must support static loads (equipment weight) and dynamic loads (movement of fluids, machinery vibration).
Seismic and Wind Resistance: Designed to withstand earthquakes and wind forces.
Thermal Expansion: Accommodates the high-temperature variations in processing plants.
Materials:
High-strength steel with corrosion resistance is commonly used to withstand harsh chemical environments.
Coatings and treatments (e.g., galvanization or epoxy coatings) for additional protection.
Integration Features:
Modular Design: Prefabricated sections for ease of assembly and future upgrades.
Process Piping and Instrumentation Support: Integrated to house pipes, valves, and control instruments.
Safety Systems: Equipped with platforms, ladders, and escape routes for maintenance and emergencies.
Applications:
Refining: Supports equipment like distillation columns, heat exchangers, and storage tanks.
Chemical Plants: Houses reactors, separators, and other specialized process units.
Compliance and Standards:
Adherence to engineering standards like ASME, API, or Eurocodes.
Regular inspections and maintenance to ensure structural integrity.
New Materials Steel Structure Factory Project
Luoyang Hengrun Metallurgical Technology Co., Ltd. Plant Project
Luoyang Achemet Tungsten-Molybdenum Technology Steel Structure Plant Project
Ordos Zhongtian Hechuang Refining and Chemical Steel Structure Project
Beihai Finished Oil Reserve Base Steel Structure Roof Project
Composite Steel Pipe Segment for Lining Ring of Communication Channel
Heavy Oil Catalytic Cracking Unit Steel Structure Project
Steel Structure Project for Medical Emergency Treatment Centre