Bearing industrial park in Yiyang County Luoyang City, China

Metallurgical Steel Structure
Metallurgical Steel Structure
Home Products Metallurgical Steel StructureNew Materials Steel Structure Factory Project
New Materials Steel Structure Factory Project
New Materials Steel Structure Factory Project
New Materials Steel Structure Factory Project
New Materials Steel Structure Factory Project
New Materials Steel Structure Factory Project
New Materials Steel Structure Factory Project
New Materials Steel Structure Factory Project
New Materials Steel Structure Factory Project

New Materials Steel Structure Factory Project

  • Project name: Luoyang Shengmante New Materials Co., Ltd. Structure Factory Project
  • Building area: 1# plant is a high-rise plant with a total building area of ​​5305.25㎡; 2# plant is a single-story plant with a building area of ​​10923.67㎡
  • Project design scale level: medium
  • The plant project of Luoyang Shengmante New Materials Co., Ltd. is the 1# and 2# plant and testing center project of the new energy and fine ceramic new materials project with an annual output of 100,000 tons. The project is located in the East Park of Yichuan County Industrial Cluster. The structural form of this project is steel structure.
Product Details

New Materials Steel Structure Factory Project Introduction

The plant project of Luoyang Shengmante New Materials Co., Ltd. is the 1# and 2# plant and testing center project of the new energy and fine ceramic new materials project with an annual output of 100,000 tons. The project is located in the East Park of Yichuan County Industrial Cluster. The structural form of this project is steel structure. The 1# plant is a high-rise plant with a total construction area of 5305.25m2; the building height is 38.1 meters; the 2# plant is a single-story plant, partially three-story, with a building height of 28.74m and a building area of 10923.67㎡.

The testing center is a 3-story frame structure with a building height of 12.3m. The roof waterproofing level of this project is II waterproof; the building function is a refractory material production line; the project design scale level: medium; the design reasonable service life is 50 years.

The material of the steel columns and beams in the steel structure is Q355B, the steel columns and beams are box columns and H-beams, the purlins are Q355B hot-dip galvanized, and the beam-column node connection bolts are 10.9S grade torsion shear high-strength bolts; the steel anti-slip coefficient is ≥0.40.

The total construction period for the on-site civil engineering and steel structure installation of this project is planned to be 90 days.

A steel structure factory refers to a factory or industrial facility designed and built primarily using steel as the main construction material. Steel structures are often used for factories due to their strength, flexibility, cost-effectiveness, and relatively quick construction time. Steel provides the necessary support for heavy machinery, large equipment, and high operational loads typical in manufacturing environments.

In a steel structure factory, the entire building, including its main frame, roofing system, and even internal supports, is made from steel. Steel's versatility makes it ideal for creating large, open spaces without the need for internal columns, allowing for efficient factory layouts and workflows.

Advantages of Steel Structure Factories

Speed of Construction:

Steel structures are prefabricated off-site, which allows for faster assembly and shorter construction timelines compared to traditional materials like concrete or brick. This means the factory can be up and running more quickly.

Strength and Durability:

Steel offers high strength relative to its weight and is more durable than other materials. It can withstand harsh weather conditions, heavy loads, and high operational demands.

Cost-Effectiveness:

Although the initial cost of steel may be higher than some other materials, the long-term durability, low maintenance costs, and fast construction time make it a cost-effective option for many factories.

Flexibility in Design:

Steel structures offer more flexibility in design, allowing for open, unobstructed spaces that are ideal for manufacturing and storage. The layout of the factory can easily be altered as needed.

Sustainability:

Steel is a highly recyclable material, contributing to the sustainability of the factory. Additionally, the factory's energy efficiency can be improved with the right insulation, further reducing its carbon footprint.

Maintenance:

Steel requires less maintenance compared to materials like wood, which can decay or degrade over time. With proper coating and treatment, steel structures are resistant to termites, rot, and other natural wear.