Refining and chemical integration steel structure projects involve the design and construction of steel frameworks that support the complex processes of refining and chemical production. These projects require specialized materials and engineering solutions due to the diverse and often hazardous nature of the chemicals being processed, the high temperatures and pressures involved, and the need for strict safety and environmental standards.
Refinery Process Units
Distillation Columns: Steel frameworks to support large, vertical columns used for separating components based on their boiling points.
Reactors and Converters: Steel structures to house catalytic reactors for processes like cracking, reforming, or hydroprocessing.
Heat Exchangers and Coolers: Steel frames and supports for large heat exchange systems to manage temperature control.
Storage and Blending Tanks: Steel tanks for storing raw materials, refined products, and by-products.
Chemical Production Facilities
Reactors for Chemical Synthesis: Steel structures to support large-scale reactors in the production of chemicals like fertilizers, plastics, and petrochemicals.
Mixing and Blending Units: Steel-framed systems for combining various chemicals into desired formulations or grades.
Crystallizers and Filtration Units: Steel structures to house equipment for separating solids from liquids or purifying chemicals.
Piping and Distribution Networks
Process Pipelines: Steel pipes and pipe racks to transport raw materials, chemicals, and gases between different units.
Support Structures: Steel frames, supports, and brackets to hold and protect pipelines against stress and environmental damage.
Storage and Tank Farms
Aboveground Storage Tanks (ASTs): Large steel tanks used for storing raw chemicals, intermediates, and final products.
Underground Storage Tanks (USTs): Steel-reinforced tanks designed for safety and environmental protection.
Utility and Auxiliary Systems
Power Distribution: Steel structures to house electrical equipment like transformers and generators.
Water Treatment Plants: Steel framing for systems designed to handle wastewater and cooling water in chemical plants.
Flare Systems: Steel structures that support the safe burning of excess gases to prevent pressure buildup in the system.
Control and Instrumentation Structures
Control Rooms and Instrument Racks: Steel buildings or frames to house the equipment used for monitoring and controlling plant processes.
Sensor and Valve Racks: Steel supports for critical sensors, valves, and actuators used in chemical and refining processes.
Steel Structure Workshop
Steel Structure Factory
Steel Structure Cold Storage
Logistics Park B04 Warehouse Steel Structure Project
Fuchong Intelligent Glass Tempering Equipment Project
Henan Jiyuan South Passenger Transport Station Steel Structure Engineering Design Project
Luoyang Shangke Electrical Technology Co., Ltd. Project
Luoyang Zhongyue Precision Bearing Co., Ltd. Steel Structure Plant Project