+86 15838570458

info@meichensteel.com

Bearing industrial park in Yiyang County Luoyang City, China

Industrial Steel Structure
Industrial Steel Structure
Home Products Industrial Steel StructureMozambique Steel Bridge
Mozambique Steel Bridge
Mozambique Steel Bridge
Mozambique Steel Bridge
Mozambique Steel Bridge
Mozambique Steel Bridge
Mozambique Steel Bridge
Mozambique Steel Bridge
Mozambique Steel Bridge

Mozambique Steel Bridge

  • Project name: Mozambique Steel Bridge (Second)
  • Span: 76 meters
  • Construction year: 2017
  • A steel bridge is a bridge structure primarily constructed using steel components like beams, columns, trusses, and girders to support vehicular, pedestrian, or rail traffic. Steel is widely chosen for bridge construction due to its high strength-to-weight ratio, durability, flexibility, and ability to withstand extreme environmental conditions.
Product Details

A steel structure bridge is a type of bridge that utilizes steel as the primary material for its framework. Steel is widely used in bridge construction due to its strength, flexibility, durability, and ability to withstand heavy loads and environmental stressors. These bridges come in various designs depending on their purpose, location, and load requirements.

Key Components of Steel Structure Bridges:

Steel Beams/Trusses:

I-beams: These are the most common type of beams used in steel bridges, which provide excellent support and load distribution.

Trusses: A truss is a triangular framework made from steel members that form a load-bearing structure. Truss bridges are often used for longer spans.

Decking System:

The deck is the surface of the bridge that vehicles or pedestrians travel on. Steel bridges often have concrete or steel deck plates for durability and smooth traffic flow.

Piers and Abutments:

These are the supports that hold up the bridge's superstructure. Steel piers are often used for their strength and stability.

Suspension and Cable-Stayed Systems:

Some steel bridges, especially long-span ones, incorporate suspension systems with steel cables or cable-stayed designs to support the bridge deck.

Benefits of Steel Structure Bridges:

High Strength-to-Weight Ratio:

Steel is extremely strong and able to carry heavy loads without becoming overly bulky. This makes steel ideal for long spans and high-load capacity bridges.

Durability and Longevity:

Steel bridges are resistant to corrosion (especially with protective coatings), weathering, and wear, providing a long service life with minimal maintenance.

Flexibility and Adaptability:

Steel is versatile and can be used in various bridge designs, from small pedestrian bridges to massive highway overpasses and large river crossings.

Faster Construction Time:

Prefabrication of steel components allows for faster construction and installation. The parts are manufactured offsite and assembled onsite, reducing time and cost.

Seismic Resistance:

Steel bridges are more flexible than concrete bridges, allowing them to absorb and dissipate seismic forces better, making them ideal for earthquake-prone areas.

Sustainability:

Steel is highly recyclable, making steel bridges an environmentally friendly option. At the end of their lifespan, components can be reused, reducing waste.

Related Products

Related News