+86 15838570458

info@meichensteel.com

Bearing industrial park in Yiyang County Luoyang City, China

Industrial Steel Structure
Industrial Steel Structure
Home Products Industrial Steel StructureLogistics Park B04 Warehouse Steel Structure Project
Logistics Park B04 Warehouse Steel Structure Project
Logistics Park B04 Warehouse Steel Structure Project
Logistics Park B04 Warehouse Steel Structure Project
Logistics Park B04 Warehouse Steel Structure Project
Logistics Park B04 Warehouse Steel Structure Project
Logistics Park B04 Warehouse Steel Structure Project
Logistics Park B04 Warehouse Steel Structure Project
Logistics Park B04 Warehouse Steel Structure Project

Logistics Park B04 Warehouse Steel Structure Project

  • Project name: B04 warehouse of Luoyang Bulk Commodity Logistics Park Project
  • Construction area: 18851.18㎡
  • Steel consumption: 900 tons
  • The B04 warehouse of Luoyang Bulk Commodity Logistics Park Project is located in Yiyang County, Henan Province. The total construction area of the project is 18851.18㎡, of which the base area is 17412.71㎡, the building height is 11.4m, and the steel consumption is 900t.
Product Details

The B04 warehouse of Luoyang Bulk Commodity Logistics Park Project is located in Yiyang County, Henan Province. The total construction area of the project is 18851.18㎡, of which the base area is 17412.71㎡, the building height is 11.4m, and the steel consumption is 900t.

Key Features of B04 warehouse of Luoyang Bulk Commodity Logistics Park Project

Steel Construction:

Durability and Strength: Steel offers high strength, which is ideal for large, open spaces without the need for excessive internal support beams.

Flexibility in Design: Steel structures are flexible and can be easily adapted to accommodate various operational needs.

Speed of Construction: Steel is pre-fabricated and can be assembled quickly, reducing construction time.

Large Open Space:

Steel structures allow for wide-span buildings, which are essential for storage and facilitating movement of goods and vehicles.

Sustainability:

Steel is recyclable and, when used efficiently, a steel structure logistics park can be more sustainable than other construction materials.

Cost-Effectiveness:

The use of steel can reduce maintenance costs in the long term, especially in areas with challenging weather conditions.

Versatility:

Steel structures can be easily expanded or modified to meet growing demands, making them highly adaptable to changing logistical requirements.

Advanced Technology Integration:

These parks often include automated systems for inventory management, loading/unloading docks, and efficient transportation routes.

Energy Efficiency:

Modern steel buildings often include energy-efficient features such as high-performance insulation, LED lighting, and solar panels.

Related Products

Related News