Steel structure construction involves assembling prefabricated steel components to create various building types, including industrial, commercial, and residential structures. This method is known for its speed, durability, and versatility, making it an ideal choice for modern construction projects. Below is an overview of the steel structure construction process, its benefits, and applications.
Planning and Design:
Site Survey: Assess the construction site to understand soil conditions, climate, and project requirements.
Design Phase: Develop detailed architectural and structural designs using CAD and BIM technologies. This includes load calculations, wind resistance, and seismic stability.
Manufacturing and Fabrication:
Component Manufacturing: Prefabrication of steel components (beams, columns, trusses, etc.) in a controlled factory environment.
Surface Treatments: Galvanizing, powder coating, or painting for corrosion resistance and aesthetics.
Quality Control: Rigorous inspection to ensure components meet standards.
Site Preparation:
Foundation Work: Lay a strong foundation based on soil conditions and structure type. Steel structures typically require shallow foundations like pad or strip footings.
Logistics: Transport prefabricated components to the site.
Assembly and Erection:
Steel Frame Erection: Use cranes and lifting equipment to assemble steel columns, beams, and trusses. Bolt or weld connections for stability.
Alignment and Leveling: Ensure proper alignment and leveling using precise instruments like laser levels.
Roof and Wall Installation: Attach cladding panels, purlins, and insulation materials.
Finishing Work:
Utilities Installation: Electrical, plumbing, HVAC systems, and fireproofing.
Painting and Final Coating: Enhance aesthetics and protect the structure.
Inspection: Perform a final inspection to ensure compliance with design and safety standards.
Steel Structure Workshop
Steel Structure Factory
Steel Structure Cold Storage
Logistics Park B04 Warehouse Steel Structure Project
Fuchong Intelligent Glass Tempering Equipment Project
Henan Jiyuan South Passenger Transport Station Steel Structure Engineering Design Project
Luoyang Shangke Electrical Technology Co., Ltd. Project
Luoyang Zhongyue Precision Bearing Co., Ltd. Steel Structure Plant Project