This is the most common type of structural steel used in industry due to its high tensile strength and cost-effectiveness. It contains carbon, which increases its strength, and it may also contain small amounts of other elements like manganese, phosphorus, sulfur, and silicon. Carbon steel is known for its durability, affordability, and workability.
These steels offer better mechanical properties and increased resistance to atmospheric corrosion compared to carbon steel. They contain additional elements like manganese, chromium, nickel, molybdenum, and others in small amounts to achieve their enhanced properties.
Forged steel is produced by shaping the steel through forging, which involves heating and hammering or pressing the steel into the desired shape. This process results in a stronger and more durable material compared to cast or rolled steel.
These steels are heat-treated to achieve increased strength and are often used in critical structural applications where high strength is required. They are typically available in plate form and can be up to 6 inches thick.
While not as common in structural applications due to its higher cost, stainless steel is used in environments where corrosion resistance is crucial. It contains chromium, which forms a protective layer to prevent rust, and may also contain molybdenum for additional corrosion resistance.
Also known as Corten steel, this type of steel forms a protective rust layer over time, which makes it suitable for outdoor structures where paint or coating is not desired.
Huasheng Logistics Project Steel Structure Engineering Yichuan
Henan Traffic Control Steel Structure Engineering
Yellow River Machinery Factory (Wuzhi) Steel Structure Factory
Gree Electric (Luoyang) Steel Structure Project
Zhongtian Hechuang Refining and Chemical Steel Structure Project
Steel Structure Engineering of China National Petroleum and Natural Gas First Construction Company
SAIC (Zhengzhou) Steel Structure Project
AVIC Lithium Battery Steel Structure Project
Steel Structure Car Park Project
Steel Structure Project for Medical Emergency Treatment Centre
Drive Station Steel Structure Project
Guoneng Steam Turbine Steel Structure Project