+86 15838570458

info@meichensteel.com

Bearing industrial park in Yiyang County Luoyang City, China

Steel Structure Construction and Manufacturing

Steel Structure Construction and Manufacturing

Home Steel Structure Construction and Manufacturing

Sanjian Meichen provides

users with one-stop

steel structure

customization services

  • Design
    Design

    We have a professional team of steel structure designers to provide users with one-stop customized services, which can better meet the personalized needs of customers and ensure the applicability and practicality of the products.

  • Production
    Production

    We strictly follow international green environmental protection standards in material selection, and provide users with high-quality steel structure products through advanced technology and strict quality inspection processes.

  • Installation
    Installation

    We have a professional installation team to ensure the accurate installation and smooth progress of steel structure products, which not only saves customers' time and energy, but also improves the overall quality and efficiency of the project.

What is a steel structure?

A steel structure is a type of construction that utilizes steel as the primary material for the structural framework. It is characterized by the use of steel elements such as beams, columns, trusses, and other components that are fabricated and assembled to create the load-bearing skeleton of a building or other types of structures. Steel structures are known for their strength, durability, and versatility, making them a popular choice in modern construction for a wide range of applications.

Design Display
Steel Structure Type
Steel Frame Structure

It consists of vertical steel columns, horizontal steel beams, and steel connectors that help assemble the components. These beams and columns are connected using various types of connectors such as welding or bolting, which creates a strong and stable structural steel frame.

Steel Frame Structure
Steel Truss
Steel Truss

Steel truss structures use a series of interconnected triangles to evenly distribute the weight throughout the structure. They are often used to build roofs, bridges, or other structures that require large spans.

Steel Arch Structure

These structures are arched in shape and have less bending moment compared to beam and frame structures, which helps save materials. It provides high aesthetics and good durability for industrial projects.

Steel Arch Structure
Steel Space Frame Structure
Steel Space Frame Structure

These structures use a three-dimensional steel tube frame to provide support for the entire structure, which is formed by welding steel tubes together to form a three-dimensional frame, and then covered with cladding materials to form a complete building.

Steel Cable Structure

Steel cables are anchored to towers or columns at both ends of the structure and are tensioned across the entire span of the building to form a strong suspension system.

Steel Cable Structure
Simple Structure
Simple Structure

Commonly used in low-rise building structures such as residential, small buildings, and warehouses. They are mainly composed of columns and beams without additional support structures.

Rigid Frame Structures

Made of rigid steel, they provide enhanced stability and are commonly used in commercial buildings, hangars, and stadiums. Joints are well connected to ensure long-term structural stability.

Rigid Frame Structures
Portal Rigid Steel Frames
Portal Rigid Steel Frames

They are commonly used in industrial and agricultural buildings due to their ability to span large distances with minimal internal support.

123
Steel Structure Features
01
High Strength-to-Weight Ratio

Steel is much stronger relative to its weight compared to other construction materials like concrete or wood. This makes it ideal for constructing high-rise buildings, bridges, and long-span roofs.

02
Durability

Steel is resistant to cracking, warping, and shrinking, ensuring long-lasting structures. Properly treated steel resists corrosion and environmental damage.

03
Ductility

Steel can deform under high stress without failing, allowing it to absorb and redistribute loads effectively. This property makes steel structures safer in areas prone to seismic activity.

04
Speed of Construction

Steel components are often pre-fabricated and assembled on-site, significantly reducing construction time. This efficiency minimizes labor costs and project timelines.

05
Versatility

Steel can be molded into various shapes and sizes, enabling the construction of complex and innovative designs. It is suitable for various applications, from small residential buildings to large industrial facilities.

06
Recyclability

Steel is 100% recyclable, making it an eco-friendly construction material. Old steel can be melted and reused without losing its properties.

07
Lightweight

Despite its strength, steel is lighter than many other construction materials, reducing the load on foundations and enabling larger spans.

08
Fire Resistance

Steel structures can be engineered to resist fire, but they require coatings or treatments to maintain strength at high temperatures.

09
Ease of Modification and Expansion

Steel structures can be easily modified or expanded without compromising structural integrity. This makes them adaptable to future needs.

10
Cost-Efficiency

While the initial cost of steel may be high, its durability, low maintenance requirements, and recyclability make it cost-effective over time.

MEICHEN STEEL STRUCTURE
Welded Box Steel
  • 01

    CNC cutting and beveling of plates

  • 02

    U-type assembly machine

  • 03

    Inner partition welding

  • 04

    Inner partition welding

  • 05

    Box type submerged arc automatic welding

  • 06

    Flame straightening of box beams and columns

  • 07

    Parts assembly welding

  • 08

    Shot blasting machine rust removal

  • 09

    Spray paint

Welded H-beam Production Process
  • 01

    CNC cutting of plates

  • 02

    H-type Assembly machine assembly

  • 03

    Submerged arc automatic welding

  • 04

    Straightening machine straightens flange

  • 05

    Assembly welding

  • 06

    Shot blasting machine rust removal

  • 07

    Spray paint

Steel Structure Application
Steel Structure Installation Video View More
  • Meichen Steel Structure Delivery

    Meichen Steel Structure Delivery

  • Steel structure Installation Detail Display

    Steel structure Installation Detail Display

  • Steel Structure Workshop Construction Show

    Steel Structure Workshop Construction Show

  • Steel Structure Shed Installation

    Steel Structure Shed Installation

  • The Role of Steel Structural Wind Columns

    The Role of Steel Structural Wind Columns

  • Steel Structure Lifting Detail Display

    Steel Structure Lifting Detail Display

  • How Steel Villas Are Built

    How Steel Villas Are Built

  • Primary Secondary The Difference Between Steel Structures

    Primary Secondary The Difference Between Steel Structures

Installation Standard
Design And Planning

Before installation, a detailed design and site-specific erection plan must be in place. This includes understanding the construction sequence, which is crucial for the safe and efficient assembly of the steel structure.

Foundation Preparation

The foundation must be properly prepared and leveled to support the weight of the steel structure and the equipment used during construction. It's essential to ensure that the foundation can handle the load and is stable.

Quality Of Materials

All steel materials must be thoroughly inspected according to quality standards and certificates of origin. This is especially important for structural bolts and anchor bolts, which are critical for connecting the structure's component.

Safety Precautions

Safety is paramount during steel structure installation. Workers must be equipped with personal protective equipment (PPE), and safety nets should be in place. Clear safety signs and instructions should be provided, and workers should be trained on safety regulations.

Equipment Inspection

All equipment, including cranes and forklifts, must be inspected before use. This ensures that they are in good working condition and reduces the risk of accidents during the lifting and moving of heavy steel components.

Bolt Tightening

The tightening force of bolts is crucial for the stability and safety of the structure. Specialized tools should be used to check the tightening force, and adjustments should be made as necessary.

Alignment And Leveling

Precision in the alignment and leveling of steel components is essential. High-precision measuring tools and modern technology, such as laser alignment systems, can be used to ensure accuracy.

Supervision And Inspection

Continuous supervision and inspection are necessary throughout the installation process. This includes checking the quality of connections, alignment, and structural integrity to ensure that all construction activities follow design specs and standards.

Training And Qualification

Only qualified persons with recognized knowledge, skills, or experience should conduct steel erection. Special training programs may be required for workers involved in multiple-lift rigging operations and connector procedures.

Environmental Considerations

Environmental conditions such as temperature and humidity can affect the installation process, particularly the tightening force of bolts. These factors should be taken into account during the installation.

Regulatory Compliance

Compliance with regulatory standards is mandatory. In the United States, this includes adherence to OSHA’s Construction Standards, particularly Subpart R, which covers regulations for steel erection.

Related News